7Goldsworthy LL 2ndBedroom 2010MAR14 001  I had to build a removable cover in order to get to the upstairs bathroom plumbing. : 2010, 2nd Bedroom, 7 Goldsworthy Street, Australia, March, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2010MAR14 002  I had to replace all the 40mm pipes with 50mm to allow better drainage of the bathtub. : 2010, 2nd Bedroom, 7 Goldsworthy Street, Australia, March, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2010MAR14 003  Closing in the floor joists should hopefully keep all the critters out. : 2010, 2nd Bedroom, 7 Goldsworthy Street, Australia, March, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2010MAR14 004  It's a somewhat tedious and time consuming job, as none of the deck floor joists are the same dimensions. : 2010, 2nd Bedroom, 7 Goldsworthy Street, Australia, March, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2010MAR14 005  Prior to closing this in, rats had got in and chewed the electrical cabling - not a good thing. : 2010, 2nd Bedroom, 7 Goldsworthy Street, Australia, March, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2010MAR14 006  This photo's for the Council Inspector, it shows where the cyclone straps are bolted. : 2010, 2nd Bedroom, 7 Goldsworthy Street, Australia, March, QLD, Townsville